
The Chicago Joint Public Safety Training Campus will be a new state-of-the-art facility to serve the city鈥檚 continued efforts to聽provide comprehensive, joint, best practice training for the Chicago Fire Department (CFD), the Chicago Police Department (CPD), and the Office of Emergency Management and Communications (OEMC).
The campus will expand the City鈥檚 ability to prepare for new and emerging threats through joint-training exercises and address inadequacies of the City鈥檚 existing training facilities.
The JPSTC will be a modern training campus that will encompass multiple enhancements and operational training improvements including: community spaces, computer labs, classrooms, indoor and outdoor scenario training, indoor shooting range, vehicle training and burn props.
The campus will be located at is 4433 W Chicago Ave on the site of an old railroad yard.
JPSTC is part of the INVEST South/West.聽 INVEST South/West is an unprecedented community improvement initiative under Mayor Lori E. Lightfoot to marshal the resources of multiple City departments, community organizations, and corporate and philanthropic partners toward 12 commercial corridors within 10 South and West side community areas.聽
12.9.21听–
2.1.22 –
2.18.22 –
3.1.22 @ 6PM – Please join the ward offices of Alderman Christopher Taliaferro (Ward 29) and Alderman Emma Mitts (Ward 37) along with the Chicago Department of Transportation (CDOT) for the second Virtual Community Meeting on the Austin Corridor Improvements.
4.14.22 –
5.5.22 – Subcontractor Outreach for Joint Public Safety Training Campus
5.11.22 – Community Hiring Opportunity
5.25.22 – Community Hiring Opportunity
6.03.22 – Community Hiring Opportunity
6.07.22 – Community Hiring Opportunity
6.28.22 – Community Hiring Opportunity
The Chicago Joint Public Safety Training Campus will deepen and strengthen the training capabilities of both new and current police officers, firefighters and paramedics, allowing for comprehensive cross-training among departments.聽 Additionally, it is an investment in the West Side of Chicago to bring improved connectivity between residents and public safety personnel.
The JPSTC construction project will have three phases. Phase 1 Main academy building and site work; 聽Phase 1A Community Center (Boys and Girls Club of Chicago) and two restaurants (Peach鈥檚 and Culver鈥檚); and Phase 2 Outdoor scenario village.
Phase 1 is not part of the Public Building Commission’s scope of work.聽 If you would like additional information regarding Phase 1,
Boys and Girls Club of Chicago is not part of the Public Building Commission’s scope of work. If you would like additional information regarding the
WGN9 Midday FIX Presents JPSTC
The Project scope for Phase 01A includes core and shell construction and limited interior buildout of two restaurant tenants (鈥淧eaches鈥 and 鈥淐ulvers鈥), site remediation, Public Right of Way (PROW) improvements, and associated site development (landscaping, courtyard amenities, site lighting, etc.).
The Peach鈥檚 restaurant building is anticipated to be a single-story as a sit-down restaurant with no drive-thru service.
The Culver鈥檚 restaurant building is anticipated to be a single-story structure designated as a fast casual restaurant with a drive-thru service.
View the Design-Build procurement details for Joint Public Safety Training Campus Phase 1A (Outlot Restaurant Area) Click here
Feasibility Study conducted by Architect聽 Latent Design Corporation – PS3054
Design Builder聽 BOWA Construction
Community Area Map JPSTC Map Phase 1A
Project Labor Agreement City of Chicago: Multi-Project Labor Agreement
The Project scope for Phase 2 includes construction of Tactical Village Structures which include a tactical multi-story mixed use building, a residential two flat and three flat block, a six story live fire burn tower, a multi-story mixed use live fire building, a technical rescue prop, an auto extrication area, a Haz-Mat transportation area, a rail prop area and a driver training course, and site development.
View the Design-Build procurement details for Joint Public Safety Training Campus Phase 2 (Outdoor Scenario Structures) Click here
Design Architect DLR Group – PS1395 Contract
Design Builder聽 Berglund/Brown & Momen JV, LLC
Community Area Map JPSTC Map Phase 02
Project Labor Agreement City of Chicago: Multi-Project Labor Agreement